We are delighted to announce the completion of our new warehouse in Gdańsk.
Our new warehouse has been designed with zero emissions in mind. To achieve this, we have implemented a heat pump along with photovoltaic panels. Heat distribution is managed through a mechanical system with heat recovery, which also regulates humidity levels in our storage facilities. Additionally, in our commitment to the local environment, we manage rainwater through retention and evaporation tanks with aquatic vegetation.
To facilitate unloading and reduce heat loss during winter, we have built a modern loading dock.
Furthermore, with the opening of the new warehouse, we are upgrading our forklift fleet to electric vehicles, contributing to reduced exhaust emissions.
“The essence of our business is people, and it was the human factor that played a key role in realizing this project. We thank everyone involved for their dedication, time, professionalism, and support.”
emphasized Piotr Mandziuk, CEO of Centro-chem.
Special thanks go to:
- The general contractor – Poleko Budownictwo sp. z o.o.
- Llentab sp. z o.o.
- The investor supervision team – BTCA sp. z o.o.
- The design team – DS Projekt – Architectural Design Office
- FPT Agro sp. z o.o. sp.k.
- All Centro-chem employees involved in the investment.